Priority Goals for the December Prototype (Jim O'Dell) ASSUMPTIONS: This section consists of two lists, specifying the hardware and software requirements for achieving the goals set forth in this Proposal. Hardware Requirements: A GigaMos Lambda computer with 1/2" tape drive. A NuBus extender card for the Lambda. A Macintosh II computer with 1 MB memory An Apple compatible video card and monitor A Macintosh II extended keyboard. An Apple ethernet board.(probably not) A 350 MB disk drive 2 NuBus coupler sets, with cabling and connectors. Card cage and cabinet (Mac-Mate) to hold the Falcon processor. A Falcon board set which includes processor (with Weitek floating point chip), and memory card (how much memory do we think we'll need?). Software Requirements: A port of the Montreal KMAC software from the Lambda to the Falcon. Development software for the Lambda computer (includes a cross compiler). PROPOSAL: This Proposal puts forth two sets of goals which we expect to achieve in delivering a discrete component prototype version of the Falcon Processor product. The action items in the first set of goals, called "Top Priority Prototype Functionality", are to be accomplished on or before December 30, 1988. The action items in the second set of goals, called "Second Priority Prototype Functionality", are to be accomplished as soon as possible, on a "time permits" basis. Top Priority Prototype Functionality: A Functioning screen, keyboard, mouse and file system interfaces. All Gabriel benchmarks running. Existence of a routine for timing the benchmarks. Second Priority Prototype Functionality: Cross Compiler (Will be running on Lambda) Flavors Stack Groups Virtual memory New Lambda cold load Booting from the Macintosh Garbage Collector Stack frame overflow IMPLEMENTATION: This Proposal, being of a somewhat different scope and nature than most, requires a description of what it would mean for this Proposal to pass. In Accepting this Proposal, each member of the GigaMos development team agrees to undertake all reasonable efforts to ensure that each of the Items specified in the Top Priority Prototype Functionality section exists as part of the December Prototype Falcon. In addition, Acceptance of this Proposal means that Items specified as Second Priority Prototype Functionality are to be accomplished on an "as soon as possible, as time permits" basis. COMMENTS: STATUS: Open